THE 6 PHASES OF AN ARCHITECTURE PROJECT

This post, about the phases of an architecture project, is dedicated to all those who have an idea in mind but do not know very well how to proceed in the world of architecture or who, at least, are not completely clear about it.

THE 6 PHASES OF AN ARCHITECTURE PROJECT

This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project is basic information that cannot be missing from your list of resources in the world of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases, usually 6. Some of them can be joined into one or simply that the architect is expressly asked not to take on this task.

Let's see what the phases of a "complete project" would then be:

PHASES OF AN ARCHITECTURE PROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phase answers two questions:

What do you need? And how much are the best architecture firms in Bangalore work worth for it?

As you can see, it is a phase prior to any project and you must always go through it.

At the end of the day, it is a prior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and have always wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!

This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project isbasic information that cannot be missing from your list of resources in theworld of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases,usually 6. Some of them can be joined into one or simply that the architect isexpressly asked not to take on this task.

Let's see what the phases of a "completeproject" would then be:

PHASES OF AN ARCHITECTUREPROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phaseanswers two questions:

What do you need? And how much is the bestarchitecture firms in bangalorework worth for it?

As you can see, it is a phaseprior to any project and you must always go through it.

At the end of the day it is aprior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and havealways wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project isbasic information that cannot be missing from your list of resources in theworld of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases,usually 6. Some of them can be joined into one or simply that the architect isexpressly asked not to take on this task.

Let's see what the phases of a "completeproject" would then be:

PHASES OF AN ARCHITECTUREPROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phaseanswers two questions:

What do you need? And how much is the best architecture firms in Bangalore work worth for it?

As you can see, it is a phaseprior to any project and you must always go through it.

At the end of the day it is aprior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and havealways wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project isbasic information that cannot be missing from your list of resources in theworld of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases,usually 6. Some of them can be joined into one or simply that the architect isexpressly asked not to take on this task.

Let's see what the phases of a "completeproject" would then be:

PHASES OF AN ARCHITECTUREPROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phaseanswers two questions:

What do you need? And how much is the bestarchitecture firms in bangalorework worth for it?

As you can see, it is a phaseprior to any project and you must always go through it.

At the end of the day it is aprior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and havealways wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project isbasic information that cannot be missing from your list of resources in theworld of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases,usually 6. Some of them can be joined into one or simply that the architect isexpressly asked not to take on this task.

Let's see what the phases of a "completeproject" would then be:

PHASES OF AN ARCHITECTUREPROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phaseanswers two questions:

What do you need? And how much is the bestarchitecture firms in bangalorework worth for it?

As you can see, it is a phaseprior to any project and you must always go through it.

At the end of the day it is aprior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and havealways wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project isbasic information that cannot be missing from your list of resources in theworld of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases,usually 6. Some of them can be joined into one or simply that the architect isexpressly asked not to take on this task.

Let's see what the phases of a "completeproject" would then be:

PHASES OF AN ARCHITECTUREPROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phaseanswers two questions:

What do you need? And how much is the bestarchitecture firms in bangalorework worth for it?

As you can see, it is a phaseprior to any project and you must always go through it.

At the end of the day it is aprior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and havealways wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!This post, about the phases of an architectureproject, is dedicated to all those who have an idea in mind but do not knowvery well how to proceed in the world of architecture or who, at least, are notcompletely clear about it.

Knowing the phases of an architectural project isbasic information that cannot be missing from your list of resources in theworld of top architects Bangalore

So ... How do you develop an architecture project?

Well, the architect's work is developed in phases,usually 6. Some of them can be joined into one or simply that the architect isexpressly asked not to take on this task.

Let's see what the phases of a "completeproject" would then be:

PHASES OF AN ARCHITECTUREPROJECT: DEFINITION OF THE NEEDS PROGRAM AND PROPOSAL OF ARCHITECT FEES

Or even simpler still, this phaseanswers two questions:

What do you need? And how much is the bestarchitecture firms in bangalorework worth for it?

As you can see, it is a phaseprior to any project and you must always go through it.

At the end of the day it is aprior communication between the architect and the developer.

Let's take an example:

1.- You have saved money and havealways wanted to have a semi-detached house with two floors, 4 bedrooms, 3bathrooms, 1 living room-kitchen with breakfast bar, 1 small garden, 1 garageand a beautiful sloping tile roof and that, in addition , you don't want tospend more than € 250,000.

2.- A little later you find yourideal architect, because you have worked it out choosing an architect , so youtell him about your plans for the house. *

3.- The architect then gets downto work. It analyzes the legal conditions and the urban planning in force.

This is essential to know if yourdreams are feasible according to the regulations and, once verified that theyare, make a planning of the project development deadlines, calculate your feeproposal , write everything and present it to you through a written contract.

4.- You accept the contract andproceed to the second phase.

 

2. PHASES OF AN ARCHITECTURE PROJECT: PREVIOUS STUDIES OR PRE- PROJECT

This is a creative phase . Thearchitect, with your collaboration if you wish, taking into account the programof needs of the first phase, develops a first concept of the project, in anelementary and more or less schematic way.

It is usually delivered in theform of a Preliminary Project, consisting of the presentation of floor plansand elevations with different proposals.

In this phase, models and / orbasic three-dimensional simulations of the proposals can be made. So that thedeveloper, if he is not used to reading plans, can understand them better.

Ideally, to proceed to the nextphase, you opt for one of the proposals as "final design", althoughmodifications may be made later.

3. PHASES OF AN ARCHITECTURE PROJECT : BASIC PROJECT / LICENSE APPLICATION

In this phase the Architectprepares his team and develops the so-called Basic Project (PB), alwaysattending to the requirements proposed in previous phases.

The PB, as its name suggests, isa project that does not go deeper than necessary than to apply for the license.Although it must contain, at least, certain information of a technical naturesuch as:

1.- Descriptive and constructivememory.

2.- Accreditation of CTEcompliance (Technical Building Code). For this phase it normally consists ofthe DB SI (Fire Safety)

3.- Site plans, floors,elevations ...

Upon submitting the PB, thelicense approval process begins by the respective City Council.

If everything runs its course,within a certain period that depends on each City Council, the Urban PlanningLicense will be granted and phase 3. *

 

[4] PHASES OF ANARCHITECTURE  PROJECT : EXECUTION PROJECT/ MEASUREMENTS AND BUDGET

Well, we already have an urbanplanning license or it is being processed. Now the architect has to continueworking and develop the so-called Execution Project.

This also implies that themeasurements have a 100% affinity with the plans so that there are no problemsin the future and so that the design is complete. Which does not imply anexpensive project, but experience tells us that to build something well,expensive or cheap, you have to have a good project. This is fundamental and itis really our specialty at taurusinspro Arquitectura.

5. PHASES OF AN ARCHITECTURE PROJECT: SELECTION OF THE BUILDER.

Delicate phase where they exist,in it you must choose a builder for your work.

The architect, if you have soagreed, may collaborate in this phase. Helping in the analysis of the technicalcapacity of the different candidates, as well as in the analysis of the budgetand deadline for the completion of the work.

After many years we never tire ofreminding our customers that price is not always the most important factor.

Rather, the key is to bringtogether a broad set of factors for which the promoter is not always qualified.

6. PHASES OF AN ARCHITECTURE PROJECT: TECHNICAL ASSISTANCE IN THE DIRECTION AND EXECUTION OF THE WORK.

Finally, the last phase, in which all the work done so faris materialized. Keep in mind that the certification that your project isstrictly complied with is the duty of your architect and your surveyor .

In this phase, the role of the architect is quite broad.From the clarification of the constructor's doubts in the interpretation of theproject, the provision of complementary information to the elaborated project,to helping the owner in verifying the work.

As a culmination of the project and its construction, adocument called "End of work certificate" is drawn up .  Once signed and approved ... the work isconcluded and the building is certified as ready for use and enjoyment!